Architects:
Werner Sobek, Stuttgart/Germany
Planning time:
1998 – 1999
Construction time:
1999 – 2000
Tasks completed:
architectural design and overall structural planning
Client:
Ursula and Werner Sobek, Stuttgart/Germany
Photographers
Roland Halbe, Stuttgart/Germany
Josef Schulz, Stuttgart/Germany
Four-storey building which is completely recyclable, produces no emissions and is self-sufficient in terms of heating energy requirement. The completely glazed building has high quality triple glazing panels featuring a k-value of 0.4. Its design is modular.
Because of its assembly by means of mortice-and-tenon joints and bolted joints, it cannot only be assembled and dismantled easily but is also completely recyclable. The electrical energy required for the energy concept and control engineering is produced by solar cells.








